Our Projects Construction of the Olifants River Water Resources Development Pump Station Building.Contractor: Basil Read / Valente Bros / Phambili Pipelines Mechanical and Electrical installation on the Olifants River Water Resources Development Pump Station capable of delivering 2 million cubic meters of water per day.Contractor: Basil Read / Valente Bros / Phambili Pipelines New pipework and control systems for an oil recovery facility.Contractor: Valente Bros Return Water Pump Station in Secunda.Contractor: WBHO Bolting up of an above Ground high pressure Slurry pipeline.Contractor: Valente Bros Fire Water Valve Station constructed during an upgrade at a Fuel Depot.Contractor: Valente Bros Checking coating integrity of 1800 dia steel pipeline on Olifants River Water Resources scheme.Contractor: Valente Bros Selected Fill backfill around the 1800mm dia steel pipeline on Olifants River Water Resources scheme.Contractor: Valente Bros Manufacture and welding of a 1800 mm dia steel bend on Olifants River Water Resources scheme.Contractor: Valente Bros Above ground slurry pipeline with coupling joints.Contractor: Valente Bros Above ground valve station on OTMS Oil storage facility.Contractor: WBHO 41km x 1000mm dia welded steel pipeline for the Kwandebele Region Water Augmentation scheme.Contractor: Valente Bros Construction of the 1500 dia Nsezi Water Scheme.Contractor: WBHO Twin 1100 mm dia steel pipeline from Dam wall to the first offtake chamber.Contractor: Valente Bros New Pipework for the upgrading of the Fire Water System at a Fuel Depot.Contractor: Valente Bros Construction of a tower base.Contractor: Valente Bros / Phambili Pipelines Pipework at a Gas extraction pad.Contractor: WBHO Steel reinforcing for concrete wall. Contractor: Valente Bros External Pipework at the OTMS Oil Tanking Facility.Contractor: WBHO Fitting a 1000mm dia valve at the OTMS Oil Tanking Facility.Contractor: WBHO Construction of 15 ML Water Reservoir.Contractor: Valente Bros Pump station pipework at the OTMS Oil Tanking Facility.Contractor: WBHO Flare Stack on the OTMS Oil Tanking Facility.Contractor: WBHO Building extensions to warehouse facility.Contractor: Valente Bros 42 and 20 inch pig diverters on the OTMS Oil Tanking Facility oil pipeline.Contractor: WBHO Construction of a new raw water pump station.Contractor: WBHO Welder welding a steel pipe joint.Contractor: Valente Bros